Thought I better provide an update on our latest custom home.

We have had a gorgeous spring in Calgary and have been building away on our latest custom home.

The sloping lot started to take shape with the energy efficient ICF foundation blocks. The concrete was poured on a cloudless day.

But it wasn't really until the main floor subfloor went on and we backfilled around the house that the lot and house took shape.

Most of our main floor walls are now up showing window and door openings. The very large opening on the front will have an impressive 14' Kolbe folding door system that will open the wall of windows up onto the not yet present deck.

We are now ready for the second floor engineered floor system to be delivered and in a few days we will be able to walk on the second floor! I can hardly wait to see the view from a little higher up.